PureH2O
Key Challenges: Concerned about unreliable and insufficient supply, this client required a tap system that delivered high volumes of boiling water and which either concealed or made use of unsightly…
Read MorePureH2O
Key Challenges This client, a global bank, sought to supply drinking water to 5,000 staff across multiple floors, plus hospitality requirements as needed. They required a product with a modern…
Read MorePureH2O
Key Challenges Our client, a government facility, required large volumes of boiling water to serve up to 3,000 people at a time. Our client sought an environmentally sustainable drinking water…
Read MorePureH2O
Key Challenges This client required a reliable drinking water delivery solution; their experience with systems from other suppliers was poor and they wanted a technically superior product to ensure optimum…
Read More